Hot search:
 

90L Rope Round Shape Basin Injection Mold

Click on the image to check the artwork
unit price: negotiable
min amount:
amount:
period for delivery: Consignment Deadline Days
area: Beijing
Expiry date : Long Effective
last update: 2017-08-14 05:00
view count: 482
enquiry
Company Profile
 
 
Product details


90L Rope bucket mold

Mold Size

840x840mm / advice choose 880Ton injection machine

Mold cavity

single cavity

Mold Steel

P20 forging steel, the original hardness is HRC25-28 degree

Mold steel treatment way

At final arranged hardness treatment for the core and cavity plates to HRC32 degree

Mold gate way

Cold runner

Mold uselife

300000 shots

Mold cycle time

60 sec

1st. Test mold time

55 days after confirmed mold drawing files

Mold doff way

Air gates

Package

PET film covered then packing into standard wooden case


-If this rope bucket mold can work full automatic?

Can be designed, but on normal choose semi-automatic in order to get prefect surface bucket from mould;

-During production this bucket mould will get big voice each shot or not?

We designed exhaust (venting) on side, then won’t happen this problem.

-If fill material easy or not for this rope bucket mould?

Yes, that is fill material very fast and easy, machine pressure set only about 80.

If need more information about this rope bucket mould, pls contact with us. tks!


Process

Mold steel

P20, 718, 2738, 2344, 2316, S136, 3Cr13, 38CrMoAl, Mov and more

Mold cavity

1 or more (depend on client)

Surface treatments

electroplate (in order to prevent rust), thur. nitrogen (in order to rise surface hardness), vacuum quenching (in order to rise whole hardness)

Plastic materials

PP, PVC, PPR, ABS, PA, PC, POM, PS, PET, HDPE, LDPE and other

Software

UG, PRO-E, MOLDFLOW, CAD, CAE, VISI

Mold gate way

cold runner/hot runner/semi-hot runner

Mold base

HASCO, DME, LKM, HOME-MADE

Mold doff system

ejectors, off-plate, air valves, hydraulic jars, air jars, air ejectors, oil-motor and more

Mold cooling

Water cooling/air cooling/beryllium bronze cooling

Mold payment

50% down payment by T/T, 50% balance by T/T before shipment

Mold shipment

By sea/air/train

Mold packaging

packed into standard wooden cases

Mold quotation

most reasonable as rich experience


Technology

1) Mould structure design

Professional designers provide you with reasonably designed mould to shorten cycle hours.

Reducing unnecessary procedure improves efficiency.

2) Mould cooling system

According to the structural characteristics of the product and the appearance of the product , We design a reasonable form of gate for mould, such as a large gate, hidden gate, fan gate, needle gate, pin point gate etc., a reasonable channel of runner design make mold temperature balance in the shortest time to improve mould precision and productivity.

3) Accessory for mould

Slide, guide pin, guide sleeve, lifter blocks and so on are taken by wear-resistant standard parts, to ensure the mould life. 

4) Deal with mould

Quenching the mold, heat treatment to improve the hardness, then Nitriding temperature is lower , the mold will no longer need to quench mold with high surface hardness and wear resistance more than HV850


Service

1) We can repair the mould in one year for some free and provide technology. . 

2) Gurantee  period is 12months starting from the date of moulds accept in the Buyer’s factory.

3) If the moulds happen the big problem, The moulds cannot repaired, the Buyer cannot solve the problems,eg, mould crack, product  can’t moulding…any big problem(except the human error) due to the mould life can’t reach to guranteed shots.the Seller and Buyer's negotiate to slove the problem, the buyer can send it back to the factory to repair or If serious, the Seller have resposiblity to make new mould for the Buyer.


Total0bar [View All]  Related Comments
 
More>other products

[ ProductsSearch ]  [ Send Fav ]  [ Share ]  [ Print ]  [ Send Report ]  [ Close ]

 
Home | Products | Suppliers | News | Tradeshow | Sitemap | Message | RSS Feed